Hey All,
This week we are going to ride the Backbone Trail between Kanan Rd and
Encinal . We will meet at the Trailhead parking lot just before the 3rd
tunnel (the one closest to the beach) on Kanan Rd. I have hiked this trail
a few times but have never ridden it.
A nice track with a few nice climbs.
Be ready for a 6:05PM ride start.
Most of our rides are around 10 miles and last a bit under 2 hours.
The Tuesday MTB night ride is a social paced, no drop ride so lets stay
together and have a fun safe time.
Be sure to have a light capable of lighting a dark trail and lasting at
least 2.5 hours and bring a spare tube & pump at a minimum.
After we ride we will hit Ladyface Brewery to aid in recovery.
See you Tuesday night.
Kent Koral
CVC Ride Director
818-802-0826
Hey CVCrs
Temps are a bit cooler but we still have nothing to complain about since we
live in cycling nirvana. So....lets go ride!
Below is a re-cap of the rides this weekend and next week. See the ride
leaders individual posts on the mail list for more information.
Saturday: 8:30am Start at Citibank/Sprouts parking lot at Westlake Bl and
Agoura Rd.
- Purple: Petting Zoo with Beth
- Gold: Dos Vientos with Norm
- Orange: Santa Rose Rd route with TBD
- Red: RockStore/Latigo OB with Jim
Sunday: 9:00am start at Citibank/Sprouts parking lot at Westlake Bl and
Agoura Rd.
- Purple: Malibou Lake with John
- Social: Malibou Lake with Adam
Next Week:
- Tuesday Night 6PM MTB Ride: Backbone from Kanan to Encinal O/B
- Sheri's Wednesday Afternoon Landing Ride
Inclement weather policy: In the interest of safety, whenever it is either
actively raining or the ride route has wet roads, it is our club policy to
cancel a club ride. Club members may still choose to meet and ride in these
conditions; however, the ride will not be considered an official club ride.
Looking forward to a great weekend/week of riding!!!!!
Kent Koral
CVC Ride Director
818-802-0826
CVC Sunday Social / Recovery Ride -- Sunday October 30th - 9:00am
Meeting at Citibank Parking Lot - Westlake Village -- Westlake Blvd. &
Agoura Road (North East Corner)
Come out and join us for a social paced recovery ride (14 Mph Average
Speed/Pace). 25-30 miles max. and stay a while to socialize afterwards by
having an after-ride beverage and snack.
With Mulholland nicely paved from Las Virgenes to Westlake now, let's do our
Malibou Lake route this weekend, either in the normal or reverse direction.
The normal direction takes us down Agoura Rd. to a re-group at De Anza Park.
South, down Las Virgenes to Mulholland. Lake Vista Dr. and around Malibou
Lake, returning via Cornell.
The reverse direction is to ride out to Mulholland Hwy via Cornell and do a
loop around Malibou Lake. Then head East down Mulholland Hwy towards Las
Virgenes where we will return via Agoura Road. Several optional return
routes are available depending on what everyone feels like.
After ride socializing - Natural Cafe' Restaurant - Patio and/or front
grassy courtyard area. Many options at this location for beverage and food
establishments.
------
Adam Winer
socialride(a)cvcbike.org
Inclement weather policy: In the interest of safety, whenever it is either
actively raining or the ride route has wet roads, it is our club policy to
cancel a club ride. Club members may still choose to meet and ride in these
conditions; however, the ride will not be considered an official club ride.*
**
*
*CVC Sunday Purple Ride -- Sunday October 30th - 9:00am*
Meeting at Citibank Parking Lot - Westlake Village -- Westlake Blvd. &
Agoura Road (North East Corner)
Route: Malibou Lake
*Hi Purple Riders,*
This week we will ride our Malibu Lake loop in the clockwise
direction. Below is a link to the Ride With GPS website that will show you
the route. Be sure to print out a route slip if you are unfamiliar with
the area. The ride is 19.2 miles with 1215 ft. of climbing.
Here is the link: http://ridewithgps.com/routes/381518
To see Frequently Asked Questions regarding the Purple Ride, click here:
http://www.cvcbike.org/?p=3127
The purple ride is a beginner club ride with a 12-13 mph average pace but is
open to all levels. No one gets dropped and no one is left behind. Please
make sure to wear the appropriate riding attire. Please check your bike
prior to Sunday and make any necessary repairs. We will be meeting up with
the “Social Ride” afterward for some refreshments on the patio at the
Natural Cafe'. See you Sunday!
*Things you need for every ride.*
Helmet-Mandatory
Water or Sports Drink
I.D.
Cell phone
Spare tube
CO2 cartridge or hand pump
Patch kit
Route slip
*John Caffrey, CVC Purple Ride Leader*
*805-231-0151*
CVC Saturday Purple Ride -- Saturday Oct 29th 8:30 AM
Meeting at Citibank Parking Lot - Westlake Village -- Westlake Blvd. & Agoura Road (North East Corner)
Route: Petting Zoo
Hi Purple Riders,
This Saturday Beth McElhenny will lead the Purples on the "Petting Zoo" route. (Okay, I've never seen any animals at the end of that road so maybe it's time we re-name the route? LOL) As usual, there will be an extra loop around Westlake at the end for those who would like and extra 5 flat miles.
Here is a link to the Ride With GPS website that will
show you the route. Be sure to print out a route slip if you are
unfamiliar with the area. The ride is 18.8 miles with 902 ft. of
climbing. http://ridewithgps.com/routes/303596
To see Frequently Asked Questions regarding the Purple Ride, click here: http://www.cvcbike.org/?p=3127
The Purple ride is a beginner club ride with a 12-13 mph average
pace but is open to all levels. No one gets dropped and no one is left
behind. Please make sure to wear the appropriate riding attire. Please
check your bike prior to Saturday and make any necessary repairs.
Things you need for every ride:
Helmet-MandatoryWater or Sports DrinkI.D.Cell phoneSpare tubeCO2 cartridge or hand pumpPatch kitRoute slip
CVC Purple Team! :-)
Beth McElhenny
818-207-3186
Hi Everyone,
This week Orange will ride the Santa Rosa Rd loop.
I will not be riding so if someone would help keep an eye on the group, I
would appreciate it.
For a detailed map and route slip, go to:
http://ridewithgps.com/routes/290166
As usual, we will meet at the Citibank parking lot and have our pre-ride
announcements promptly at 8:30AM prior to splitting into our groups and
departing.
The Orange ride is an intermediate/advanced recreational ride 40 to 50 miles
in length with an average pace of 15+mph. It is not a "no drop ride" but as
always let's try to stick together and have a fun,safe ride.
Inclement weather policy: In the interest of safety, whenever it is either
actively raining or the ride route has wet roads, it is our club policy to
cancel a club ride. Club members may still choose to meet and ride in these
conditions; however, the ride will not be considered an official club ride.
After the ride, please join us at one of the many refueling options
available at the finish such as Natural Cafe, Sea Casa, East Coast Bagel,
Sprouts Market, etc..
Please remember to park in the area along Westlake Bl.(between the street
and the first driveway aisle) and not in the area in front of the
Shops/Market. If we don't respect the requests of the lease tenants, we
could be asked to park elsewhere.
See you Soon,
Kent Koral
CVC Ride Director
(818) 802-0826
Different responses... but now we have a wind factor.. supposed to be big..
SO... my vote would not be to do canyons... but.. let's see what really pans
out! See you tomorrow everyone!
_____
From: runisbliss(a)aol.com [mailto:runisbliss@aol.com]
Sent: Tuesday, October 25, 2011 9:56 PM
To: ohsheri2005(a)sbcglobal.net
Subject: Re: [cvc announce] Wednesday afternoon Landing Ride
c u then
-----Original Message-----
From: sheri <ohsheri2005(a)sbcglobal.net>
To: Shiela Sherwyn <runisbliss(a)aol.com>
Cc: CVC announcements <announce(a)mail.cvcbike.org>
Sent: Mon, Oct 24, 2011 9:56 pm
Subject: [cvc announce] Wednesday afternoon Landing Ride
After Monday's and Tuesdays frigid cold... (ok, kidding), Wednesday is
supposed to warm up!
Let's stretch those mid-week legs with an afternoon ride.
Please email me with suggestions for a route and I will finalize the
decision and announce it. Be mindful of traffic at this hour.
CVC Wednesday Landing Ride
Oct. 26
3:45pm
Route Ideas: Agoura to Las Virgenes
Right on Mullholland
Malibu Lake Lap and back
North Ranch Loop via Erbes to Arboles to Westlake
Hidden Valley
Carlisle with lake lap?
Rock Store
The Landing ride is an intermediate recreational ride 20 to 25 miles in
length with an average pace of 14+mph. It is not a "no drop ride" but let's
try to stick together and have a fun,safe time.
Inclement weather policy: In the interest of safety, whenever it is either
actively raining or the ride route has wet roads, it is our club policy to
cancel a club ride. Club members may still choose to meet and ride in these
conditions; however, the ride will not be considered an official club ride.
Come on and ride with us!
Sheri
818 621-1713
_______________________________________________
announce mailing list
announce(a)mail.cvcbike.org
You can unsubscribe and manage your message preferences here:
https://mail.cvcbike.org/mailman/listinfo/announce
Hi Red Riders I and a few others are going to be riding the Santa Barbara Century this coming SaturdayFor those of you staying local, may I suggest the following Red Ride:
Saturday, October 22nd CVC Red Ride
8:30am Citibank/Sprouts Parking lot
(NE Corner of Agoura/Hampshire Rd.s/Westlake Blvd.)
CVC RED Ride:
Ride over to and up Rock Store: Then from top of Rock Store, options are:
1) Up and down Latigo Canyon to PCH
- back up Latigo Canyon - then back to Westlake
Other options from the top of Rock Store are........
2) Across Mulholland Hwy -descend Upper Encinal Canyon and down Lower Encinal Canyon to PCH
3) Across and down entire Mulholland Hwy to PCH to Leo Carrillo Campground
Then from Leo Carrillo Campground....
Choose a return route back up and over to Westlake Village.
Deer Creek
Yerba Buena
Mulholland Hwy
Decker Canyon
Encinal Canyon
Latigo Canyon
After ride coffee & socializing - Natural Cafe' and/or other food/beverage establishmentswithin walking distance of your parked car.See you next week
Jim Doane - CVC Sec/Red Ride leader
After Monday's and Tuesdays frigid cold... (ok, kidding), Wednesday is
supposed to warm up!
Let's stretch those mid-week legs with an afternoon ride.
Please email me with suggestions for a route and I will finalize the
decision and announce it. Be mindful of traffic at this hour.
CVC Wednesday Landing Ride
Oct. 26
3:45pm
Route Ideas: Agoura to Las Virgenes
Right on Mullholland
Malibu Lake Lap and back
North Ranch Loop via Erbes to Arboles to Westlake
Hidden Valley
Carlisle with lake lap?
Rock Store
The Landing ride is an intermediate recreational ride 20 to 25 miles in
length with an average pace of 14+mph. It is not a "no drop ride" but let's
try to stick together and have a fun,safe time.
Inclement weather policy: In the interest of safety, whenever it is either
actively raining or the ride route has wet roads, it is our club policy to
cancel a club ride. Club members may still choose to meet and ride in these
conditions; however, the ride will not be considered an official club ride.
Come on and ride with us!
Sheri
818 621-1713
Hey All,
This week Cheeseboro is up in our rotation. We will meet in the lower
Cheeseboro Canyon Parking Lot on Cheeseboro Rd N of Driver Ave
(don't park in the upper lot since they lock the gate). Be ready for a
6:05PM start.
Most of our rides are around 10 miles and last a bit under 2 hours.
The Tuesday MTB night ride is a social paced, no drop ride so lets stay
together and have a fun safe time.
Be sure to have a light capable of lighting a dark trail and lasting at
least 2.5 hours and bring a spare tube & pump at a minimum.
After the ride we will hit Ladyface Brewery to aid in recovery.
See you Tuesday night.
Kent Koral
CVC Ride Director
818-802-0826